Turning a design into documents a contractor can build from: detailing, drawings, specifications, code verification and cost estimates. It rewards anyone who’s spent real time in a CD set.
Weighting ranges are NCARB's, shown as a share of scored questions. The heavier the rule, the more the content area counts.
In a CSI three-part specification section, where do installation tolerances belong?
Which information belongs primarily in the specifications rather than the drawings?
A design development estimate comes in 12% over the owner’s budget. What’s the most appropriate response?